![ec-1](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-1.jpg)
Govt. Approved Class ‘A’ Electrical Contractor And CPRI Approved Manufacturer Of HT/LT Electrical Panels.
ATOZ INFRA
Electrical Turnkey Projects
We are pleased to introduce ourselves as the manufacturer of LT/HT Electricals Panels. An ISO 9001-2015, ISO 14001- 2015, ISO 18001-2007 and CPRI Approved company, And Govt. Approved class ‘A’ Electrical contractor for erection & commissioning, industrial fitting/wiring, 132 KV/ 33 KV/ 11KV/ 440 V Sub-Station Works.
We Involve in Installation, Designing, Consultancy testing & Commissioning of all types of electrical panels & projects.
ATOZ Infra Projects Pvt. Ltd. Combines the best people, Resources, Systems and Services in the industries to Deliver The Best To You.
- Highly trained and experienced personnel that is always looking toward to serving your need
- A team of engineers, supervisors, electricians and fitters dedicated to working.
- All the tools and manpower to complete the project work in time.
Our Turnkey Services
- 132KV, 33KV 11KV & Sub-Stations
- Cale Laying In Trench Or In Ground
- Cable Jointing And Termination
- Insulations Testing of Electrical Equipments
- Switch Boards & Switch Gears
- Earthing & Earth Grids
- Electrical Design & Testing
- Industries Installation
- Industrial Wiring
- Lighting & Power
- Temporary Site Establishment
- Capacitor Banks
- Electrical Instruments
- PLC & SCADA Wiring
- Data Cabling
- Solar Project
- DG Stack
![ec-2](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-2.jpg)
![ec-3](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-3.jpg)
Panels Manufacturing Unit
![ec-7](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-7.jpg)
![ec-8](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-8.jpg)
Manufacturing Facilities
We Have state of the art machineries, modernized assembly layout, complete inhouse – Fabrication, Powder Coating, Testing & inspection Facilities
LIST OF PLANT & MACHINERY
- CNC Turrent Punch Press
- CNC Shearing Machine 2 Set
- CNC Bending Machine 2 Set
- Hydraulic Bus Bar shearing & Bending Machine
- Hydraulic Punching Machine
- Hydraulic knibling Machine
- 9 Tank Pre Treatment System
- Conveyorized Powder Coating System
- Battery Operated Controlled Tightening Tools
- DG Set 62.5 KVA & UPS 5.6 KVA
- Mig Welding Machines
- Hacksaw Cutter
- Hand Drills
- Jigsaw Machines
- Powder Drill Machines
- Busbar Sleeve Shrink Machine
![ec-9](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-9.jpg)
![ec-10](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-10.jpg)
![ec-11](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-11.jpg)
![ec-12](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-12.jpg)
Testing Facilities
- Primary Current Injection Kit 5000 Amp.
- Secondary Current Injection Kit.
- Contact Make Break Test bench.
- DC/AC variable Voltage Bench.
- 5KV/10KV/80KV H.V. tester.
- Digital Paint Coat Gauge Elcometer.
- Polarity Tester.
- Mlli Volt Test Drop Meter.
- Relay O/L Testing & Calibration Bench.
- Salt Spray Test Kit.
- Digital Conductivity Meter for Aluminium / Copper Busbar.
- Mechanical Endurance Test Bunch.
- Chemical Lab for measurement of the concentration of chemicals used in 9 tank
- heet treatment process.
![ec-13](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-13.jpg)
![ec-14](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-14.jpg)
![ec-15](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-15.jpg)
Power Quality Management
Scope of Work
- Harmonic Study
- Power Factory Study
- Load Study
- Energy Consuming Study
- Phase Voltage & Current Unbalance
Benefits
- Significant Energy Saving Due to Reduced Losses
- Increased Life of Machine
- Improved Reliability of the Electrical Network
- Reduce Failure of Sensitive Equipment
Photos Of Our Executed Work
![ec-16](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-16.jpg)
![ec-17](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-17.jpg)
![ec-18](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-18.jpg)
![ec-19](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-19.jpg)
![ec-20](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-20.jpg)
![ec-21](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-21.jpg)
![ec-22](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-22-1.jpg)
![ec-23](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-23.jpg)
![ec-24](https://atozinfraprojects.com/wp-content/uploads/2022/01/ec-24.jpg)